Nanlong ( Lianyungang ) Chemicals
Co., Ltd is (relocated and renamed from Jiangyin Longdeng Chemicals
Co., Ltd) invested and established by a Taiwanese, Mr. Zhang Xianshi.
Its registered capital comes to USD 7.50 million and the total investment
of enterprise reaches 75 million. The company has employed 60 staffs
in the company, among whom there are 5 technicians. After settlement
in Lianyungang Industrial Park, Nanlong ( Lianyungang ) Chemicals
Co., Ltd currently produces sodium cyanate, 98% methomyl and 90% methomyl
powders. In 2013, our company plans to produce thiodicarb and it covers
an area of 26,000 sqm.
Nanlong ( Lianyungang ) Chemicals Co., Ltd was registered in 2006
and prepared to establish in 2007. From the launch in 2008 to 2011,
our company has actually invested USD 7.5 million.
Our company has possessed pesticide registration certificate: methomyl
(PD20070075), 90% methomyl powders(PD20084082)and thiodicarb(PD20110263).
It has obtained approval of thiodicarb producing fixed enterprise.
Production approval certificate: 90% methomyl powders (HNP32079-A1787)
95% thiodicarb approval certificate
Enterprise standard: thiodicarb (Q/320281 NG 05-2009)
methomyl powders(Q/320281 NG 04-2011)
Jiangsu Lianyungang Chemicals Industrial Park is the first chemical
industrial park established through approval of the state. The industrial
park is scheduled to be a chemical industrial park mainly distributing
such “intermediate products” as textile dyes, pesticides, pharmaceutical
and high-tech fine chemicals as well as becoming the industrial base
and privately operated economical growing point of Lianyungang City
in the near future. It will develop into a larger scale and integrated
one to have resources shared in the long period. For its prospect,
it will develop into a modern, high-tech, garden type new chemical
city with a size of small city. At present, such infrastructure as
heating, water supply, power supply and sewage pipe network has been
improved gradually. The temporary central heating boiler can meet
the needs of enterprises in the park, water supply facility has already
been put into use and sewage treatment plant project has already been
put into operation. |
|